Production Company: Bondz Productions            Date: 14/09/12

Director:  Alex Mihai

Crew: Mahfuz Ahmed, Alex Mihai, Zahid Ahmed                                           
                                  
Details of Activities                                               Date: 14/09/12

Pre-production:
The Pitch: Alex will be doing a brief introduction of the movie by Friday 14th of September

Feedback on Pitch: Alex will be analysing the possible problems identified by the audience during our pitch. He will do this by 21/09/12 

Proposal: Mahfuz will be doing a proposal for the movie in which he will be talking about the synopsis, purpose of the movie, and description of content and target audience by 21/09/12

Draft Poster (hand drawn) – Mahfuz and Alex will do two hand drawn posters. This will be done by 28/09/12

Treatment: Zahid will be explaining our idea in detail talking about things such as Mise-en-scene, shots and overview of the narrative by 21/09/12

Audience profile: Alex will be doing a detailed description of the target audience for our movie in which he will be talking about our primary target audience and secondary target audience this will be done by 21/09/12

Resources for Mise-en-scene: Zahid will be explaining what sort of props will be using in our movie by 21/09/12

Annotation of Film Reviews (layout) – Zahid, Alex and Mahfuz will each individually be working on annotating three different film reviews layout. This will be done by 05/10/12 

Annotation of Film Reviews (content) - Alex, Mahfuz and Zahid will each individually be annotating the content of at least two film reviews from their textual analysis. This will be done by 05/10/12 

Textual analysis Alex, Zahid and Mahfuz will each individually produce a textual analysis of a similar movie theirs this will be done by 28/09/12

Screenplay: Zahid will talk about the structure of the scenes and the dialogue in them in a detailed planned structure he will do this by 05/10/12

Shot List: Alex will be doing a detailed shot list of the movie in which he will talk about camera shots, sizes and movement by 28/09/12

Recce Report: Mahfuz will be taking pictures of the locations and he will assess the possible problems we may face when filming. This will be done by 05/10/12

Storyboard: Alex and Mahfuz will be drawing detailed shots of our story this will be done by 05/10/12

Risk Assessment: Zahid will assess the risks we might face when filming. This will be done by 05/10/12

Production:
Filming Days Monday 8th of October to Sunday 30 October 

Filming Rough Cut One: 08/10/12 – 04/11/12 
 
Filming For Rough Cut Two 10/11/12 – 25/11/12

Post Production:

Editing for Rough Cut One: 05/11/12 -25/11/12

Editing for Rough Cut Two 26/11/12 – 30/11/12

Final Cut Deadline: 01/12/12 – 07/12/12